Heating: Installation of a 4.7MW Biomass Boiler, connecting the new biomass boiler to the existing boiler houses & storage tanks, relocation of the existing gas boiler & the installation of CO2 fan. Hot water piped system, 200kW gas fired boiler c/w a flue, 1 x 200l diaphragm expansion vessel.
Electrics: Supply & commission the Hoogendoorn economic climate control system
Heating: Justsen boiler Installation c/w twin wall s/s flue, Heating system installation connecting the new boiler to the existing system, insulation, glasshouse modification to offload the boiler, concrete works for the biomass boiler. Installation of a Javo Toploader fuel store with 4m W & portal height of 5m for the biomass boiler
Electrics & Control: Biomass boiler, Heating system, Javo Top loader, Hoogendoorn system
Heating: Piping in of 2 x Endress 900kW Biomass boiler plant, transport main & expansion system.
Electrics: Biomass boiler and heating plant.
Heating: Piping in of 500kw Biomass boiler plant, transport main & expansion system.
Electrics: Biomass boiler,heating plant & access lighting.
Area: 3465 m2
Heating: hot water, high level pipes to existing 3465m2 wide span house. Piping in of 2000 kW Biomass boiler plant, transport main & expansion system.
Electrics: Biomass boiler plant & heating.
Heating: Installation of 1500 kW Biomass straw fired boiler plant, transport main & expansion system, installation of heat store.